Showing posts with label ON SITE MILLING. Show all posts
Showing posts with label ON SITE MILLING. Show all posts

Wednesday, September 2, 2009

On Site sawmilling,, From Logs to Lumber

i
Here the Customer contracted with me to bring the mill on site to cut up a Bunch of Yellow Pine logs for numerous building projects he had in mind, which some include enclosing in a pole barn with board and batten construction, as well as porch material he wanted , for an edition he planed in the near future,, in most case's the yellow pine can be ready to go in about 3 months with a low enough moisture content.