Wednesday, September 2, 2009

On Site sawmilling,, From Logs to Lumber

i
Here the Customer contracted with me to bring the mill on site to cut up a Bunch of Yellow Pine logs for numerous building projects he had in mind, which some include enclosing in a pole barn with board and batten construction, as well as porch material he wanted , for an edition he planed in the near future,, in most case's the yellow pine can be ready to go in about 3 months with a low enough moisture content.

No comments:

Post a Comment